11) Sub-Soil Investigation Multistoried Plaza for Parking at Lines Area, Karachi.
Client: M/s C.D.G.K
Consultant: E.C.I.L
12) Sub-Soil Investigation for Gold Crest Commercial Complex (5 towers of 30 stories, D.H.A Phase II, Islamabad.
Client: M/s Al- Ghurair-Giga
Consultant: M/s Alliance Consultant
13) Sub-Soil Investigation for Karakoram Highway between Gilgit and Khunjrab (China Border)
Client: M/s National Highway Authority
14) Geotechnical Report on Desalination Plant (DHA/ Cogan Ltd) at Phase-8 DHA Clifton Beach, Karachi.
Client: M/s Siemen’s Pakistan Engg co Ltd
Consultant: M/s E.C.I.L.
15) Sub-Soil Investigation for 300 MW Power Plant near KTPS.
Client: M/s Siemens Pak Engineer Company Ltd.
|
|
16) Sub-Soil Investigation for the Construction of De-salination Plant Gwadar- Industrial Estate. Surbandar, Gwadar.
Client: M/s Siddiqe son services (Pvt) Ltd.
Consultant: M/s Consult Group.
17) Sub-Soil Investigation for 35 storied Avari Hotel (former Al- Faisal Hotel) Islamabad.
Client: M/s E.C.I.L
18) Sub-Soil Investigation for various Bridges (CH: 599+350) HRP contract # 05 (Ubaro-Sheikh Wahan section).
Client: M/s Lilley-Shahrukh (JV)
Consultant: M/s SMEA / EA (J.V)
19) Sub-Soil Investigation for the Construction at Umer Gas Field / Condensate processing Facility near Tando Allahyar-Sindh.
Client: M/s Orient Petroleum Industries.
20) Geo-technical report for various Bridges on CDGK’s proposed Highway along Karachi Coast.
Client: M/s CDGK
Consultant: M/s E.C.I.L. |